Overview

Engineering Solutions: Under-Road Sewage Pumping Stations

Functional Purpose

This type of technological structure represents an innovative solution for organizing sewer infrastructure in locations where standard placement options are not possible. It is especially in demand in high-density cities, where maintaining regulated distances from residential buildings is critical.

Layout Solutions

The standard set of componentsincludes:

  • A sealed cylindrical tank for collecting wastewater
  • A comprehensive treatment system with multiple filtration levels
  • Submersible pump units
  • A utility network of pipelines for waste transfer
  • A special removable structure for protection
  • A reinforced concrete slab with service hatches

Technical Specifications

Key performance indicatorsof the units:

  • Dimensions of the housing in Diameter: 1–4 meters
  • Maximum structure height: up to 20 meters
  • Capacity: up to 10,000 cubic meters per hour
  • Created pressure: up to 100 meters of water column
  • Size of service openings: 600 millimeters

Design requirements

Critical factors when planning:

  • Optimal location taking into account fire safety regulations
  • Engineering calculation of the load-bearing capacity of the protective structure
  • Development of an effective air exchange system
  • Creation of safe conditions for maintenance
  • Reinforcement of structural elements for transport load

Automated Systems

Intelligent controlis implemented through:

  • Float-based level sensor system
  • Protective filtration for pumping equipment
  • Automatic unit start-up mode
  • Continuous filling level monitoring

Additional Equipment

Extended configurationmay include:

  • Materials for thermal insulation of the structure
  • Remote monitoring and control systems
  • Gas environment analysis devices
  • Gate gate valves
  • Mechanisms for crushing solid inclusions
  • Lifting and Installation Equipment

Competitive Advantages

Outstanding Featuresof the Installations:

  • Efficient Use of Land
  • Strict Compliance with Building Regulations
  • Automated Operation
  • Highly Reliable Design
  • Comfortable Maintenance
  • Flexibility in Adapting to Specific Tasks

Installation Conditions

Critical Parametersof the Installation:

  • Accurate Calculation of Protective Coating Thickness
  • Correct Load Distribution Without Contact with the Housing
  • Reliable Moisture Protection
  • Free access for work
  • Compliance with all safety standards

Such engineering solutions are becoming an indispensable element of urban infrastructure, effectively combining sewer system performance with optimal use of space and strict compliance with building codes.


Model overview

Those. information

Download

Colors

DOP

More in this category:

Need a consultation?

We will tell you in detail about our services, types of work and typical projects, calculate the cost and prepare an individual offer!